Marin Deck Pros Call (415) 555-0199

Custom decks built for Marin hillsides.

Redwood, composite, and ipe decks — engineered for steep lots, fog, and wildfire zones, and built by one crew from first post to final board.

Serving San Rafael, Mill Valley, Novato, Sausalito, Tiburon, and the rest of Marin County.

Call (415) 555-0199 Request a site visit

Modern home with a wood deck and outdoor living space
Illustrative photo — example of a modern backyard deck.

What we build

Custom wood decks

Redwood and ipe decks sized to the lot — ground-level patios to multi-level hillside decks with stairs and landings.

Planning range: $55–$85 / sq ft (redwood)

Composite decks

Trex and TimberTech boards for low upkeep in fog and shade, with hidden fasteners and matching fascia.

Planning range: $75–$110 / sq ft

Deck repair & resurfacing

Keep a sound frame and replace worn boards, railing, and stairs — or rebuild when the structure has had its day.

Priced after a site visit

Railings, pergolas & lighting

Cable and glass railing that keeps the view, pergolas for shade, and low-voltage lighting for evening use.

See the estimator below

Planning ranges cover a typical deck, framing, and standard railing. Hillside work, engineering, permits, and features add cost — the estimator below shows how. Every real price comes after a site visit.

Deck cost estimator

Pick a material, a size, and a lot type. The total is the sum of the line items — nothing hidden.

Typical Marin decks run about 200–600 sq ft.

Features (optional)

Your planning estimate

$17,600–$27,200

Planning range, not a quote. Permits, engineering, and site conditions are priced after a visit. Try it: a 320 sq ft redwood deck on a flat lot is $17,600–$27,200.

Get a real price — request a site visit

Redwood vs. composite vs. ipe

MaterialBest forUpkeepPlanning range
Redwood The classic Marin look; warm, light, and easy to repair board by board. Clean and re-oil every 1–2 years, more often in full sun. $55–$85 / sq ft
Composite Shady, foggy lots and homeowners who want low upkeep. Wash a few times a year; no oiling or staining. $75–$110 / sq ft
Ipe A dense hardwood for a long-life deck where budget allows. Oil to keep the brown color, or let it silver naturally. $95–$140 / sq ft

Honest advice is one of our promises — see About Us. In deep shade under redwoods, composite often wins. On a sunny, well-drained lot, redwood is hard to beat for the money.

Project types

Ground-level decks

Low decks that step straight onto the garden. Simplest build, fastest permit path.

Elevated & hillside decks

Posts, piers, and engineered footings for sloped Marin lots, with stairs and landings.

Multi-level decks

Two levels that follow the slope, so the upper level meets the house and the lower meets the yard.

Resurfacing

New boards, railing, and stairs on a frame that is still sound.

Guides: deck costs, materials & permits in Marin

These are short summaries of the three guides we publish for Marin homeowners. Each will become its own full guide page when the blog is added — see the plan in the project README.

How much does a deck cost in Marin?

Most Marin decks land between $55 and $140 per square foot depending on material, with hillside work adding $12–$20 per square foot. A 320 sq ft redwood deck on a flat lot plans at $17,600–$27,200 before permits and features.

Composite vs. redwood by Marin microclimate

Mill Valley and Fairfax shade stays damp — composite resists the mildew cycle there. Sunny Novato and San Rafael lots suit redwood well. In Sausalito and Tiburon, salt air argues for stainless fasteners whatever the board.

Marin deck permits, in plain English

Most decks over 30 inches high, and any deck attached to the house, need a building permit from your city or town — plus engineering on steep lots and fire-resistant details in WUI zones. We handle the drawings and the submittal; the town still sets the timeline.

Frequently asked questions

Do I need a permit for a deck in Marin?

Usually yes if the deck is more than 30 inches above grade or attached to the house. Low, freestanding platforms are sometimes exempt, but the rule varies by town. We check with your town's building department before we quote — see Areas & Products for your town's counter.

What is a WUI fire zone, and does it change my deck?

WUI stands for wildland-urban interface — areas where homes meet wildland, common across Marin's hills. In a WUI zone, decks need fire-resistant details: non-combustible or ignition-resistant materials near the ground, metal flashing, and no debris traps underneath. We design for it from the start rather than bolting it on later.

How long does a deck take?

A straightforward ground-level deck is often 1–2 weeks of building once permits are in hand. An elevated hillside deck is typically 3–5 weeks. Permits are the long pole — allow 4–8 weeks for most towns, longer if design review or engineering is involved.

Can you build on a steep lot?

Yes — most Marin lots are sloped, and hillside decks are our everyday work. Steep lots need engineered footings, careful drainage, and a realistic access plan for materials. That is why the estimator adds $12–$20 per square foot for hillside lots.

Will you give me a price without visiting?

A planning range, yes — that is what the estimator is for. A firm price, no. Slope, access, soil, and the condition of an existing deck change the number too much to guess from photos alone.

Ready to talk about your deck? Tell us your town and roughly what you need, and we will set up a site visit.
Request a site visit or call (415) 555-0199.